• Monroe County Road Closings & Construction for the Week of March 27, 2023

    ROAD CLOSINGS

    • BURMA ROAD, between Mt Pleasant Road & Buskirk Road: Burma Road will be closed in this area on Wednesday, March 22, 2023 - Friday, March 24, 2023, and again on Monday, March 27, 2023 - Friday, March 31, 2023, for Monroe County CB Crews to replace a culvert.
    • OLD SR 37 NORTH, between Audubon Drive & Old Meyers Road: Old SR 37 North will be closed in this area from 8am - 5pm, Mondays - Fridays, beginning Monday, March 6, 2023 - Friday, March 31, 2023 for Crider & Crider to begin work on the Bicentennial Pathways project. Tree clearing and waterline relocation will begin at Audubon Drive and move north to Old Meyers Road. Detour: Sample Road/I-69/Business 37 North or Old Meyers Road/Boltinghouse Road/Bethel Lane.

    ADVANCED NOTICE OF ROAD CLOSINGS

    • DANIELS WAY, between SR 48 & Cook Medical: Daniels Way will be closed on Saturday, April 15, 2023, from 5am - 1pm for the Hoosier Half Marathon event.
    • KELLER CROSSING, between Daniels Way & Wellness Way: Keller Crossing will be closed in this area on Saturday, April 15, 2023, from 5am - 1pm for the Hoosier Half Marathon event.
    • KNAPP ROAD, between SR 48 & Keller Crossing: Knapp Road will be closed to through traffic in this area on Saturday, April 15, 2023, from 5am - 1pm for the Hoosier Half Marathon event.
    • WELLNESS WAY, between Hartstrait Road & Innovation Drive: Wellness Way will be closed in this area on Saturday, April 15, 2023, from 5am - 1pm for the Hoosier Half Marathon event.
    • ZENITH DRIVE, between Daniels Way & Profile Parkway: Zenith Drive will be closed to through traffic in this area on Saturday, April 15, 2023, from 5am - 1pm for the Hoosier Half Marathon event.
    • OLD SR 37 NORTH, between Audubon Drive & Old Meyers Road: Old SR 37 North will be closed in this area from Monday, April 3, 2023 - December 15, 2023, for the remainder of the Bicentennial Pathways Project. School bus routes and EMS access will be coordinated and maintained. Detour: Sample Road/I-69/Business 37 North or Old Meyers Road/Boltinghouse Road/Bethel Lane.

    ROAD CONSTRUCTION

    • ANDY WAY, between Natasha Drive & Norway Drive: Monroe County SW Crews will be repairing a storm inlet in this area on Friday, March 31, 2023, from 7am - 3pm. There will be lane restrictions with traffic control.
    • BURCH ROAD, between I-69 & Mt Zion Road: Monroe County MVH Crews will be ditching from 7220 S Burch Road to Mt Zion Road on Monday, March 20, 2023 - Friday, March 24, 2023, from 7am - 3pm. There will be lane restrictions with traffic control.
    • HARMONY ROAD, between Koontz Road & Kirksville Road: Monroe County SW Crews will be repairing the ditch in this area on Thursday, March 30, 2023, from 7am - 3pm. There will be lane restrictions with traffic control.
    • HARMONY ROAD, between May Road & Rose Creek Road: Monroe County SW Crews will be repairing the ditch in this area on Tuesday, March 28, 2023, from 7am - 3pm. There will be lane restrictions with traffic control.
    • LOESCH ROAD, between Old Vernal Pike & Woodyard Road: Monroe County SW Crews will be ditching in this area on Friday, March 24, 2023 and again on Monday, March 27, 2023, from 7am - 3pm. There will be lane restrictions with traffic control.
    • OLD SR 374 SOUTH, between Rogers Road & Chumley Road: Monroe County SW Crews will be repairing the ditch in this area on Wednesday, March 29, 2023, from 7am - 3pm. There will be lane restrictions with traffic control.
    • SAMPLE ROAD, from I-69 to Old SR 37 North: Sample Road remains under construction in this area through spring of 2023. The roadways are open to traffic and construction activities will take place as weather permits. Expect intermittent lane restrictions with traffic control.
    • SAMPLE ROAD, from I-69 to Simpson Chapel Road: Sample Road remains under construction in this area through spring of 2023. The roadways are open to traffic and construction activities will take place as weather permits. Expect intermittent lane restrictions with traffic control.
    • SIMPSON CHAPEL ROAD, from Bottom Road to Sample Road: Simpson Chapel Road remains under construction in this area through spring of 2023. The roadways are open to traffic and construction activities will take place as weather permits. Expect intermittent lane restrictions with traffic control.

    ---

    Monroe County Road Closings & Construction for the Week of March 13, 2023

    ROAD CLOSINGS

    • KERR CREEK ROAD, approximately 3/4-mile North of SR 46: Kerr Creek Road will be closed in the vicinity of 5801 E Kerr Creek Road on Wednesday, March 16, 2023 - Friday, March 17, 2023, from 7am - 3pm for Monroe County SW Crews to stabilize the bank.
    • OLD SR 37 NORTH, between Audubon Drive & Old Meyers Road: Old SR 37 North will be closed in this area from 8am - 5pm, Mondays - Fridays, beginning Monday, March 6, 2023 - Friday, March 31, 2023 for Crider & Crider to begin work on the Bicentennial Pathways project. Tree clearing and waterline relocation will begin at Audubon Drive and move north to Old Meyers Road. Detour:  Sample Road/I-69/Business 37 North or Old Meyers Road/Boltinghouse Road/Bethel Lane.
    • WAMPLER ROAD, between Stafford Road & Bowman Road: Wampler Road will be closed in this area from Monday, March 13, 2023 - Tuesday, March 14, 2023, for Monroe County CB Crews to replace a culvert.
    • WAMPLER ROAD, between Bowman Road & Burma Road: Wampler Road will be closed in this area from Tuesday, March 14, 2023 - Wednesday, March 15, 2023 for Monroe County CB Crews to replace a culvert.
    • WAMPLER ROAD, between Burma Road & ECM: Wampler Road will be closed in this area from Thursday, March 16, 20203 - Friday, March 17, 2023, for Monroe County CB Crews to replace a culvert.

    ADVANCED NOTICE OF ROAD CLOSINGS

    • DANIELS WAY, between SR 48 & Cook Medical: Daniels Way will be closed on Saturday, April 15, 2023, from 5am - 1pm for the Hoosier Half Marathon event.
    • KELLER CROSSING, between Daniels Way & Wellness Way: Keller Crossing will be closed in this area on Saturday, April 15, 2023, from 5am - 1pm for the Hoosier Half Marathon event.
    • KNAPP ROAD, between SR 48 & Keller Crossing: Knapp Road will be closed to through traffic in this area on Saturday, April 15, 2023, from 5am - 1pm for the Hoosier Half Marathon event.
    • WELLNESS WAY, between Hartstrait Road & Innovation Drive: Wellness Way will be closed in this area on Saturday, April 15, 2023, from 5am - 1pm for the Hoosier Half Marathon event.
    • ZENITH DRIVE, between Daniels Way & Profile Parkway: Zenith Drive will be closed to through traffic in this area on Saturday, April 15, 2023, from 5am - 1pm for the Hoosier Half Marathon event.
    • OLD SR 37 NORTH, between Audubon Drive & Old Meyers Road: Old SR 37 North will be closed in this area from Monday, April 3, 2023 - December 15, 2023, for the remainder of the Bicentennial Pathways Project. School bus routes and EMS access will be coordinated and maintained. Detour:  Sample Road/I-69/Business 37 North or Old Meyers Road/Boltinghouse Road/Bethel Lane.

    ROAD CONSTRUCTION

    • HARMONY ROAD, between Koontz Road & Kirksville Road: Monroe County SW Crews will be installing a culvert in the vicinity of 6767 S Harmony Road on Tuesday, March 14, 2023, from 7am - 3pm. There will be lane restrictions with traffic control.
    • MAY ROAD, between Rockport Road & Blaiklee Court: Monroe County MVH Crews will be ditching from 5501 W May Road to Rockport Road on Monday, March 13, 2023 - Friday, March 17, 2023 from 7am - 3pm. There will be lane restrictions with traffic control.
    • SAMPLE ROAD, from I-69 to Old SR 37 North: Sample Road remains under construction in this area through spring of 2023. The roadways are open to traffic and construction activities will take place as weather permits. Expect intermittent lane restrictions with traffic control.
    • SAMPLE ROAD, from I-69 to Simpson Chapel Road: Sample Road remains under construction in this area through spring of 2023. The roadways are open to traffic and construction activities will take place as weather permits. Expect intermittent lane restrictions with traffic control.
    • SIMPSON CHAPEL ROAD, from Bottom Road to Sample Road: Simpson Chapel Road remains under construction in this area through spring of 2023. The roadways are open to traffic and construction activities will take place as weather permits. Expect intermittent lane restrictions with traffic control.
    • TUNNEL ROAD, between Shilo Road & Goose Hollow Road: Monroe County SW Crews will be installing a culvert in the vicinity of 6886 N Tunnel Road on Monday, March 13, 2023, from 7am - 3pm. There will be lane restrictions with traffic control.

    https://www.co.monroe.in.us/egov/apps/document/center.egov?view=item;id=198

    ---

    Monroe County Road Closings & Construction for the Week of March 6, 2023

    ROAD CLOSINGS

    • EARL YOUNG ROAD, between Everett Arnold Drive & Lentz RoadEarl Young Road will be closed from 5056 E Earl Young Road to Everett Arnold Drive from 7am - 3pm on Monday, March 6, 2023 for ditching by Monroe County SW Crews. 
    • KERR CREEK ROAD, between SR 46 & Gettys Creek RoadKerr Creek Road will be closed Monday, March 6, 2023 - Tuesday, March 7, 2023 for Monroe County CB Crews to replace several culverts. This will be a rolling closure beginning at 6869 Kerr Creek Road and moving east to Gettys Creek Road.  
    • OLD SR 37 NORTH, between Audubon Drive & Old Meyers RoadOld SR 37 North will be closed in this area from 8am - 5pm, Mondays - Fridays, beginning Monday, March 6, 2023 - Friday, March 31, 2023 for Crider & Crider to begin work on the Bicentennial Pathways project. Tree clearing and waterline relocation will begin at Audubon Drive and move north to Old Meyers Road.  Detour: Sample Road/I-69/Business 37 North or Old Meyers Road/Boltinghouse Road/Bethel Lane.
    • OLD SR 37 NORTH, between Audubon Drive & Old Meyers RoadOld SR 37 North will be closed in this area from Monday, April 3, 2023 - December 15, 2023, for the remainder of the Bicentennial Pathways Project. School bus routes and EMS access will be coordinated and maintained. Detour: Sample Road/I-69/Business 37 North or Old Meyers Road/Boltinghouse Road/Bethel Lane.
    • WAMPLER ROAD, between Liberty Hollow Road & Stafford LaneWampler Road will be closed in this area from Tuesday, March 7, 2023 - Thursday, March 9, 2023, for Monroe County CB Crews to replace several culverts. This will be a rolling closure beginning at 4925 W Wampler Road and moving east to Stafford Lane.
    • WAMPLER ROAD, between Stafford Lane & Burma RoadWampler Road will be closed in this area from Thursday, March 9, 2023 - Friday, March 10, 2023 for Monroe County CB Crews to replace several culverts. This will be a rolling closure beginning at 4120 Wampler Road and moving east to Burma Road.
    • WAMPLER ROAD, between Burma Road & ECMWampler Road will be closed in this area on Friday, March 10, 2023, for Monroe County CB Crews to replace a culvert.

    ROAD CONSTRUCTION

    • BOLTINGHOUSE ROAD, between Old Meyers Road & Earl Young RoadMonroe County SW Crews will be ditching in the vicinity of 3991 E Boltinghouse Road on Thursday, March 9, 2023, from 7am - 3pm. There will be lane restrictions with traffic control.
    • BURMA ROAD, between Buskirk Road & Wampler RoadMonroe County MVH Crews will be ditching in this area on Monday, March 6, 2023 - Friday, March 10, 2023 from 7am - 3pm.  There will be lane restrictions with traffic control.
    • EARL YOUNG ROAD, at the intersection of Lentz RoadMonroe County SW Crews will be cleaning out a culvert in this area Tuesday, March 7, 2023 - Wednesday, March 8, 2023, from 7 am - 3 pm. There will be lane restrictions with traffic control.
    • KERR CREEK ROAD, between SR 46 & Gettys Creek RoadMonroe County SW Crews will be stabilizing the bank in this area on Friday, March 10, 2023, from 7am - 3pm. There will be lane restrictions with traffic control.
    • SAMPLE ROAD, from I-69 to Old SR 37 NorthSample Road remains under construction in this area through spring of 2023. The roadways are open to traffic and construction activities will take place as weather permits. Expect intermittent lane restrictions with traffic control.
    • SAMPLE ROAD, from I-69 to Simpson Chapel Road: Sample Road remains under construction in this area through spring of 2023. The roadways are open to traffic and construction activities will take place as weather permits. Expect intermittent lane restrictions with traffic control.
    • SIMPSON CHAPEL ROAD, from Bottom Road to Sample RoadSimpson Chapel Road remains under construction in this area through spring of 2023. The roadways are open to traffic and construction activities will take place as weather permits. Expect intermittent lane restrictions with traffic control.

    https://www.co.monroe.in.us/egov/apps/document/center.egov?view=item;id=198

    ---

    Monroe County Road Closings & Construction for the Week of February 27, 2023

    ROAD CLOSINGS

    • EARL YOUNG ROAD, between Everett Arnold Drive & Lentz Road: Earl Young Road will be closed from 5056 E Earl Young Road to Everett Arnold Drive from 7am - 3pm on Monday, February 27, 2023 - Friday, March 3, 2023 for ditching by Monroe County SW Crews. 
    • KERR CREEK ROAD, between SR 46 & Gettys Creek Road: Kerr Creek Road will be closed Monday, February 27, 2023 - Friday, March 3, 2023 for Monroe County CB Crews to replace several culverts. This will be a rolling closure beginning at 5671 Kerr Creek Road and moving east to Gettys Creek Road. 

    ROAD CONSTRUCTION

    • BURMA ROAD, between Buskirk Road & Wampler Road: Monroe County MVH Crews will be ditching in this area on Monday, February 27, 2023 - Friday, March 3, 2023 from 7am - 3pm. There will be lane restrictions with traffic control. 
    • SAMPLE ROAD, from I-69 to Old SR 37 North: Sample Road remains under construction in this area through spring of 2023. The roadways are open to traffic and construction activities will take place as weather permits. Expect intermittent lane restrictions with traffic control. 
    • SAMPLE ROAD, from I-69 to Simpson Chapel Road: Sample Road remains under construction in this area through spring of 2023. The roadways are open to traffic and construction activities will take place as weather permits. Expect intermittent lane restrictions with traffic control. 
    • SIMPSON CHAPEL ROAD, from Bottom Road to Sample Road: Simpson Chapel Road remains under construction in this area through spring of 2023. The roadways are open to traffic and construction activities will take place as weather permits. Expect intermittent lane restrictions with traffic control.

    https://www.co.monroe.in.us/egov/apps/document/center.egov?view=item;id=198

    ---

    Monroe County Road Closings & Construction for the Week of February 13, 2023

    ROAD CLOSINGS

    • HARMONY ROAD, between Ison Road & May Road: Harmony Road will be closed in the vicinity of 5393 S Harmony Road on Wednesday, February 15, 2023 - Thursday, February 16, 2023 for Monroe County CB Crews to install a culvert.
    • TUNNEL ROAD, between Murat Road & Robinson Road: Tunnel Road will be closed in this area on Wednesday, February 15, 2023 - Friday, February 17, 2023 for Monroe County CB Crews to install a culvert. 

    ROAD CONSTRUCTION

    • GARDNER ROAD, between Garrison Chapel Road & ECM: Monroe County MVH Crews will be ditching in this area on Monday, February 13, 2023 - Friday, February 17, 2023 from 7am - 3pm. There will be lane restrictions with traffic control.
    • HARMONY ROAD, between Ison Road & Koontz Road: Monroe County SW Crews will be ditching in this area on Thursday, February 16, 2023 - Friday, February 17, 2023 from 7am - 3pm. There will be lane restrictions with traffic control.
    • KERR CREEK ROAD, between Gettys Creek Road & SR 46: Monroe County MVH Crews will be ditching in this area on Monday, February 13, 2023 - Wednesday, February 15, 2023 from 7am - 3pm. There will be lane restrictions with traffic control.
    • SAMPLE ROAD, from I-69 to Old SR 37 North: Sample Road remains under construction in this area through spring of 2023. The roadways are open to traffic and construction activities will take place as weather permits. Expect intermittent lane restrictions with traffic control.
    • SAMPLE ROAD, from I-69 to Simpson Chapel Road: Sample Road remains under construction in this area through spring of 2023. The roadways are open to traffic and construction activities will take place as weather permits. Expect intermittent lane restrictions with traffic control.
    • SIMPSON CHAPEL ROAD, from Bottom Road to Sample Road: Simpson Chapel Road remains under construction in this area through spring of 2023. The roadways are open to traffic and construction activities will take place as weather permits. Expect intermittent lane restrictions with traffic control.
    • WAMPLER ROAD, between Bowman Road & ECM: Monroe County SW Crews will be ditching in this area on Monday, February 13, 2023 - Wednesday, February 15, 2023. There will be lane restrictions with traffic control.

    https://www.co.monroe.in.us/egov/apps/document/center.egov?view=item;id=198

    ---

    Monroe County Road Closings & Construction for the Week of February 6, 2023

    ROAD CLOSINGS

    • CHAPEL HILL ROAD, between Guthrie Road & Roberts RoadChapel Hill Road will be closed in this area on Tuesday, February 7, 2023 - Friday, February 10, 2023 for Monroe County CB Crews to replace several culverts. This will be a rolling closure beginning at Guthrie Road and proceeding east to Roberts Road.
    • CHAPEL HILL ROAD, between Roberts Road & SR 446Chapel Hill Road will be closed in this area on Monday, February 6, 2023 for Monroe County CB Crews to replace several culverts. This will be rolling closure beginning at Roberts Road and proceeding east to SR 446.

    ROAD CONSTRUCTION

    • HARMONY ROAD, between Kirksville Road & Koontz RoadMonroe County SW Crews will be ditching in this area on Monday, February 6, 2023 - Tuesday, February 7, 2023 from 7am - 3pm. There will be lane restrictions with traffic control.
    • KERR CREEK ROAD, between Gettys Creek Road & SR 46Monroe County MVH Crews will be ditching in this area on Monday, February 6, 2023 - Friday, February 10, 2023 from 7am - 3pm. There will be lane restrictions with traffic control.
    • SAMPLE ROAD, from I-69 to Old SR 37 NorthSample Road remains under construction in this area through spring of 2023. The roadways are open to traffic and construction activities will take place as weather permits. Expect intermittent lane restrictions with traffic control.
    • SAMPLE ROAD, from I-69 to Simpson Chapel Road: Sample Road remains under construction in this area through spring of 2023. The roadways are open to traffic and construction activities will take place as weather permits. Expect intermittent lane restrictions with traffic control.
    • SIMPSON CHAPEL ROAD, from Bottom Road to Sample RoadSimpson Chapel Road remains under construction in this area through spring of 2023. The roadways are open to traffic and construction activities will take place as weather permits. Expect intermittent lane restrictions with traffic control.

    https://www.co.monroe.in.us/egov/apps/document/center.egov?view=item;id=198

    ---

    Monroe County Road Closings & Construction for the Week of January 30, 2023

    ROAD CLOSINGS

    • CHAPEL HILL ROAD, between Guthrie Road & Roberts Road: Chapel Hill Road will be closed in this area on Tuesday, January 31, 2023 - Friday, February 3, 2023 for Monroe County CB Crews to replace several culverts. This will be a rolling closure beginning at Guthrie Road and proceeding east to Roberts Road.
    • CHAPEL HILL ROAD, between Roberts Road & SR 446: Chapel Hill Road will be closed in this area on Friday, February 3, 2023 - Friday, February 10, 2023 for Monroe County CB Crews to replace several culverts. This will be rolling closure beginning at Roberts Road and proceeding east to SR 446.
    • HARMONY ROAD, south of Ison Road: Harmony Road will be closed in this area on Monday, January 30, 2023 for Monroe County CB Crews to replace a culvert. 

    ROAD CONSTRUCTION

    • HARMONY ROAD, between Rose Creek Drive & Koontz Road: Monroe County SW Crews will be ditching in this area on Monday, January 30, 2023 - Friday, February 3, 2023 from 7am - 3pm. There will be lane restrictions with traffic control.
    • KERR CREEK ROAD, between Gettys Creek Road & SR 46: Monroe County MVH Crews will be ditching in this area on Monday, January 30, 2023 - Friday, February 3, 2023 from 7am - 3pm. There will be lane restrictions with traffic control.
    • SAMPLE ROAD, from I-69 to Old SR 37 North: Sample Road remains under construction in this area through spring of 2023. The roadways are open to traffic and construction activities will take place as weather permits. Expect intermittent lane restrictions with traffic control.
    • SAMPLE ROAD, from I-69 to Simpson Chapel Road: Sample Road remains under construction in this area through spring of 2023. The roadways are open to traffic and construction activities will take place as weather permits. Expect intermittent lane restrictions with traffic control.
    • SIMPSON CHAPEL ROAD, from Bottom Road to Sample Road: Simpson Chapel Road remains under construction in this area through spring of 2023. The roadways are open to traffic and construction activities will take place as weather permits. Expect intermittent lane restrictions with traffic control.

    https://www.co.monroe.in.us/egov/apps/document/center.egov?view=item;id=198

    ---

    • 1/24/2023: Due to the potential incoming Winter Storm, Monroe County Government Offices will be closed on Wednesday, January 25, 2023. This includes the Courts and Prosecutor's offices. Emergency services will continue to operate as normal. Please be safe.

    ---

    Monroe County Road Closings & Construction for January 23, 2023

    ROAD CLOSINGS

    • HARMONY ROAD, between Koontz Road & Ison Road: Harmony Road will be closed in this area on Monday, January 23, 2023 - Wednesday, January 25, 2023 for Monroe County CB Crews to replace several culverts. This will be a rolling closure beginning at Kirksville Road and moving north to Ison Road.

    ROAD CONSTRUCTION

    • HARMONY ROAD, between SR 45 and May RoadMonroe County SW Crews will be ditching in this area on Thursday, January 19, 2023 - Friday, January 20, 2023 from 7am - 3pm. There will be lane restrictions with traffic control.
    • HINKLE ROAD, between Bethel Lane & ECMMonroe County MVH Crews will be ditching in this area on Tuesday, January 10, 2023 - Friday, January 20, 2023 from 7am - 3pm. There will be lane restrictions with traffic control.
    • KERR CREEK ROAD, between Gettys Creek Road & SR 46Monroe County MVH Crews will be ditching in this area on Tuesday, January 17, 2023 - Friday, January 20, 2023 from 7am - 3pm. There will be lane restrictions with traffic control.
    • SAMPLE ROAD, from I-69 to Old SR 37 NorthSample Road remains under construction in this area through the spring of 2023. The roadways are open to traffic and construction activities will take place as weather permits. Expect intermittent lane restrictions with traffic control.
    • SAMPLE ROAD, from I-69 to Simpson Chapel Road: Sample Road remains under construction in this area through the spring of 2023. The roadways are open to traffic and construction activities will take place as weather permits. Expect intermittent lane restrictions with traffic control.
    • SIMPSON CHAPEL ROAD, from Bottom Road to Sample RoadSimpson Chapel Road remains under construction in this area through the spring of 2023. The roadways are open to traffic and construction activities will take place as weather permits. Expect intermittent lane restrictions with traffic control.

    https://www.co.monroe.in.us/egov/apps/document/center.egov?view=item;id=198

    ---

    Monroe County Road Closings & Construction for the Week of January 16, 2023 

    ROAD CLOSINGS 

    • GARDNER ROAD, between Hoff Lane & ECM: Gardner Road will be closed in this area on Monday, January 9, 2023 - Friday, January 13, 2023 for Monroe County CB Crews to replace several culverts. This will be a rolling closure beginning at Hoff Lane and moving west to the end of county maintenance.
    • HARMONY ROAD, between Rockport Road & Mt Zion Road: Harmony Road will be closed in this area on Monday, January 16, 2023 - Friday, January 20, 2023 for Monroe County CB Crews to replace several culverts. This will be a rolling closure beginning at Rockport Road and moving north to Mt Zion Road. 
    • HARMONY ROAD, between Kirksville Road & Ison Road: Harmony Road will be closed in this area on Monday, January 23, 2023 - Wednesday, January 25, 2023 for Monroe County CB Crews to replace several culverts. This will be a rolling closure beginning at Kirksville Road and moving north to Ison Road. 

    ROAD CONSTRUCTION 

    • HARMONY ROAD, between SR 45 and May Road: Monroe County SW Crews will be ditching in this area on Thursday, January 19, 2023 - Friday, January 20, 2023 from 7am - 3pm. There will be lane restrictions with traffic control.
    • HINKLE ROAD, between Bethel Lane & ECM: Monroe County MVH Crews will be ditching in this area on Tuesday, January 10, 2023 - Friday, January 20, 2023 from 7am - 3pm. There will be lane restrictions with traffic control.
    • KERR CREEK ROAD, between Gettys Creek Road & SR 46: Monroe County MVH Crews will be ditching in this area on Tuesday, January 17, 2023 - Friday, January 20, 2023 from 7am - 3pm. There will be lane restrictions with traffic control.
    • SAMPLE ROAD, from I-69 to Old SR 37 North: Sample Road remains under construction in this area through the spring of 2023. The roadways are open to traffic and construction activities will take place as weather permits. Expect intermittent lane restrictions with traffic control.
    • SAMPLE ROAD, from I-69 to Simpson Chapel Road: Sample Road remains under construction in this area through the spring of 2023. The roadways are open to traffic and construction activities will take place as weather permits. Expect intermittent lane restrictions with traffic control.
    • SIMPSON CHAPEL ROAD, from Bottom Road to Sample Road: Simpson Chapel Road remains under construction in this area through the spring of 2023. The roadways are open to traffic and construction activities will take place as weather permits. Expect intermittent lane restrictions with traffic control.
    • SMITHVILLE ROAD, between SR 37 & Strain Ridge Road: Monroe County SW Crews will be ditching in this area on Monday, January 9, 2023 - Friday, January 13, 2023 from 7am - 3pm. There will be lane restrictions with traffic control.
    • SMITHVILLE ROAD, between Zikes Road & Fairfax Road: Monroe County SW Crews will be ditching in this area on Tuesday, January 17, 2023 - Wednesday, January 18, 2023 from 7am - 3pm. There will be lane restrictions with traffic control.
    • TUNNEL ROAD, between SR 45 East & ECM: Monroe County MVH Crews will be ditching in this area on Monday, January 9, 2023 - Friday, January 13, 2023 from 7am - 3pm. There will be lane restrictions with traffic control.

    https://www.co.monroe.in.us/egov/apps/document/center.egov?view=item;id=198

    ---

    Monroe County Road Closings & Construction for the Week of January 9, 2023

    ROAD CLOSINGS

    • 1/11/2023 EMERGENCY ROAD CLOSING - MOFFET LANE, between Fairfax Road & Ornamental Drive: Moffett Lane will be closed from 2500 E Moffett Lane to Ornamental Drive effective immediately to repair a sink hole. It is estimated to be closed for 2 days.

     

    • GARDNER ROAD, between Hoff Lane & ECM: Gardner Road will be closed in this area on Monday, January 9, 2023 - Friday, January 13, 2023 for Monroe County CB Crews to replace a culvert.

    ROAD CONSTRUCTION

    • SAMPLE ROAD, from I-69 to Old SR 37 NorthSample Road remains under construction in this area through the spring of 2023. The roadways are open to traffic and construction activities will take place as weather permits. Expect intermittent lane restrictions with traffic control.
    • SAMPLE ROAD, from I-69 to Simpson Chapel Road: Sample Road remains under construction in this area through the spring of 2023. The roadways are open to traffic and construction activities will take place as weather permits. Expect intermittent lane restrictions with traffic control.
    • SIMPSON CHAPEL ROAD, from Bottom Road to Sample RoadSimpson Chapel Road remains under construction in this area through the spring of 2023. The roadways are open to traffic and construction activities will take place as weather permits. Expect intermittent lane restrictions with traffic control.
    • SMITHVILLE ROAD EAST, between SR 37 & Strain Ridge Road: Monroe County SW Crews will be ditching in this area on Monday, January 9, 2023 - Friday, January 13, 2023 from 7am - 3pm. There will be lane restrictions with traffic control.
    • TUNNEL ROAD, between SR 45 East & ECM: Monroe County MVH Crews will be ditching in this area on Monday, January 9, 2023 - Friday, January 13, 2023 from 7am - 3pm. There will be lane restrictions with traffic control.

    https://www.co.monroe.in.us/egov/apps/document/center.egov?view=item;id=198

    ---

    Monroe County Road Closings & Construction for the Week of January 2, 2023

    ROAD CLOSINGS

    • GARDNER ROAD, between Garrison Chapel Road & Hoff Lane: Gardner Road will be closed in this area on Tuesday, January 3, 2023 - Friday, January 6, 2023 for Monroe County CB Crews to replace a culvert.
    • THE INTERSECTION OF HOFF LANE & GARRISON CHAPEL ROAD: The intersection of Hoff Lane & Garrison Chapel Road will be closed on Tuesday, January 3, 2023 - Wednesday, January 4, 2023 for Monroe County CB Crews to replace a culvert.

    ROAD CONSTRUCTION

    • SAMPLE ROAD, from I-69 to Old SR 37 North: Sample Road remains under construction in this area through the spring of 2023. The roadways are open to traffic and construction activities will take place as weather permits. Expect intermittent lane restrictions with traffic control.
    • SAMPLE ROAD, from I-69 to Simpson Chapel Road: Sample Road remains under construction in this area through spring of 2023. The roadways are open to traffic and construction activities will take place as weather permits. Expect intermittent lane restrictions with traffic control.
    • SIMPSON CHAPEL ROAD, from Bottom Road to Sample Road: Simpson Chapel Road remains under construction in this area through the spring of 2023. The roadways are open to traffic and construction activities will take place as weather permits. Expect intermittent lane restrictions with traffic control.
    • SMITHVILLE ROAD EAST, between SR 37 & Zikes Road: Monroe County SW Crews will be ditching in this area on Tuesday, January 3, 2023 - Wednesday, January 4, 2023 from 7am - 3pm. There will be lane restrictions with traffic control.
    • SMITHVILLE ROAD EAST, between Zikes Road & Strain Ridge Road: Monroe County SW Crews will be ditching in this area on Thursday, January 5, 2023 - Friday, January 6, 2023 from 7am - 3pm. There will be lane restrictions with traffic control.
    • TUNNEL ROAD, between SR 45 East & ECM: Monroe County MVH Crews will be ditching in this area on Tuesday, January 3, 2023 - Friday, January 6, 2023 from 7am - 3pm. There will be lane restrictions with traffic control.

     

    https://www.co.monroe.in.us/egov/apps/document/center.egov?view=item;id=198

     

    ---

    Monroe County Road Closings & Construction for the Week of December 19, 2022

    ROAD CLOSINGS

    • HOWARD ROAD, between Starnes Road & SR 48: Howard Road will be closed in the vicinity of 9110 W Howard Road on Monday, December 19, 2022 for Monroe County CB Crews to replace a culvert.
    • THE INTERSECTION OF SIMPSON CHAPEL ROAD & SAMPLE ROAD:  This intersection remains closed to through traffic.  Road construction will continue until further notice.
    • SAMPLE ROAD, from I-69 to Old SR 37 North: Sample Road remains closed to through traffic in this area. Road construction will continue until further notice. Detour uses Wayport Road, Ellis Road, Showers Road and Mel Currie Road, no through trucks. Trucks use I-69 to Walnut (Business 37 N) to Old SR 37 N.
    • SAMPLE ROAD, from I-69 to Simpson Chapel Road: Sample Road remains closed to through traffic in this area. Road construction will continue until further notice. Detour uses Simpson Chapel Road, Burma Road, Chambers Pike and Wayport Road. Note: If Bottom Road and/or Woodall Road floods, people north of Simpson Chapel will be able to use Dittemore Road. People south of Simpson Chapel will be able to use Lawson Road. Thru traffic will need to detour via I-69 to Sample Road or via Mt Tabor Road. The Sample Road north/south section (Lawson detour) will stay open until the intersection is complete at Bottom Road and Simpson Chapel Road.
    • SIMPSON CHAPEL ROAD, from Bottom Road to Sample Road: Simpson Chapel Road remains closed to through traffic in this area. Road construction will continue until further notice. Detour uses Bottom Road, Dittemore Road, Chambers Pike and Wayport Road.

    ROAD CONSTRUCTION

    • CHAPEL HILL ROAD, between SR 446 & Guthrie Road: Monroe County MVH Crews will be ditching in this area on Monday, December 19, 2022 - Tuesday, December 20, 2022 from 7am - 3pm. There will be lane restrictions with traffic control.
    • HARMONY ROAD, between I-69 & Rockport Road: Monroe County SW Crews will be ditching in this area on Monday, December 19, 2022 - Thursday, December 22, 2022 from 7am - 3pm. There will be lane restrictions with traffic control.
    • TUNNEL ROAD, between SR 45 East & ECM: Monroe County MVH Crews will be ditching in this area on Tuesday, December 20, 2022 - Thursday, December 22, 2022 from 7am - 3pm. There will be lane restrictions with traffic control.

     

    https://www.co.monroe.in.us/egov/apps/document/center.egov?view=item;id=198

    ---

    Monroe County Road Closings & Construction for the Week of December 12, 2022

    ROAD CLOSINGS

    • DELAP ROAD, between Union Valley Road & Mt Tabor Road: Delap Road will be closed in this area on Tuesday, December 13, 2022 - Friday, December 16, 2022 for Monroe County CB Crews to replace a culvert. They will start at Union Valley Road and move west towards Mt Tabor Road.
    • THE INTERSECTION OF SIMPSON CHAPEL ROAD & SAMPLE ROAD: This intersection will be closed Tuesday, September 6, 2022 – Friday, December 16, 2022 for road construction.
    • SAMPLE ROAD, from I-69 to Old SR 37 North: Sample Road remains closed in this area through December 16, 2022 for road construction. Detour uses Wayport Road, Ellis Road, Showers Road and Mel Currie Road, No through trucks. Trucks use I-69 to Walnut (Business 37 N) to Old SR 37 N.
    • SAMPLE ROAD, from I-69 to Simpson Chapel Road: Sample Road will be closed in this area August 22, 2022 – December 16, 2022 for road construction. Detour uses Simpson Chapel Road, Burma Road, Chambers Pike and Wayport Road. Note: If Bottom Road and/or Woodall Road floods, people north of Simpson Chapel will be able to use Dittemore Road.  People south of Simpson Chapel will be able to use Lawson Road. Thru traffic will need to detour via I-69 to Sample Road or via Mt Tabor Road. The Sample Road north/south section (Lawson detour) will stay open until the intersection is complete at Bottom Road and Simpson Chapel Road.
    • SIMPSON CHAPEL ROAD, from Bottom Road to Sample Road: Simpson Chapel Road remains closed in this area through December 16, 2022 for road construction. Detour uses Bottom Road, Dittemore Road, Chambers Pike and Wayport Road.
    • SR 45 EAST, between Cox Drive & Tunnel Road: East SR 45 will be closed on Saturday, December 10, 2022 - Wednesday, December 14, 2022 in the 7000 block of East SR 45 for CenterPoint Energy to replace an existing gas main. Detour will be posted. Large trucks and equipment are to utilize East SR 46 to SR 135 as detour.
    • UNION VALLEY ROAD, between W Maple Grove Road & Delap Road: Union Valley Road will be closed in this area on Monday, December 12, 2022 for Monroe County CB Crews to replace a culvert.

    ROAD CONSTRUCTION

    • CHAPEL HILL ROAD, between SR 446 & Guthrie Road: Monroe County MVH Crews will be ditching in this area on Monday, December 12, 2022 - Friday, December 16, 2022 from 7am - 3pm. There will be lane restrictions with traffic control.
    • LARRY WAYNE DRIVE, between Smith Road & ECM: Monroe County SW Crews will be ditching in this area on Monday, December 12, 2022 - Tuesday, December 13, 2022 from 7am - 3pm. There will be lane restrictions with traffic control.
    • LEE PHILLIPS DRIVE, between Snow Road & Rockeast Road: Monroe County SW Crews will be ditching in this area on Friday, December 16, 2022 from 7am - 3pm. There will be lane restrictions with traffic control.
    • PAYNETOWN ROAD, between Handy Road & ECM: Monroe County SW Crews will be ditching in this area on Wednesday, December 14, 2022 from 7am - 3pm. There will be lane restrictions with traffic control.
    • SANDERS SECOND AVENUE, between Fairfax Road & ECM: Monroe County SW Crews will be ditching in this area on Thursday, December 15, 2022 from 7am - 3pm. There will be lane restrictions with traffic control.

     

    https://www.co.monroe.in.us/egov/apps/document/center.egov?view=item;id=198

    ---

    Monroe County Road Closings & Construction for the Week of December 5, 2022

    ROAD CLOSINGS

    • DELAP ROAD, between N Maple Grove Road & Woodall Road: Delap Road will be closed in this area on Wednesday, December 7, 2022 for Monroe County CB Crews to replace a culvert pipe.
    • THE INTERSECTION OF SIMPSON CHAPEL ROAD & SAMPLE ROAD: This intersection will be closed Tuesday, September 6, 2022 – Friday, December 16, 2022 for road construction.
    • SAMPLE ROAD, from I-69 to Old SR 37 North: Sample Road remains closed in this area through December 16, 2022 for road construction. Detour uses Wayport Road, Ellis Road, Showers Road and Mel Currie Road, No through trucks.  Trucks use I-69 to Walnut (Business 37 N) to Old SR 37 N.
    • SAMPLE ROAD, from I-69 to Simpson Chapel Road: Sample Road will be closed in this area August 22, 2022 – December 16, 2022 for road construction. Detour uses Simpson Chapel Road, Burma Road, Chambers Pike and Wayport Road.  IN CASE OF FLOODING: If Bottom Road and/or Woodall Road floods, people north of Simpson Chapel will be able to use Dittemore Road. People south of Simpson Chapel will be able to use Lawson Road. Thru traffic will need to detour via     I-69 to Sample Road or via Mt Tabor Road.  The Sample Road north/south section (Lawson detour) will stay open until the intersection is complete at Bottom Road and Simpson Chapel Road.
    • SIMPSON CHAPEL ROAD, from Bottom Road to Sample Road: Simpson Chapel Road remains closed in this area through December 16, 2022 for road construction. Detour uses Bottom Road, Dittemore Road, Chambers Pike and Wayport Road.
    • SR 45 EAST, between Cox Drive & Tunnel Road: East State Road 45 will be closed on Saturday, December 10, 2022 - Tuesday, December 13, 2022 in the 7000 block of East State Road 45 for CenterPoint Energy to replace an existing gas main. Detour will be posted.  Large trucks and equipment are to utilize East State Road 46 to State Road 135 as a detour.

    ROAD CONSTRUCTION

    • CHAPEL HILL ROAD, between SR 446 & Guthrie Road: Monroe County MVH Crews will be ditching in this area on Monday, December 5, 2022 - Friday, December 9, 2022 from 7am - 3pm. There will be lane restrictions with traffic control.
    • DELAP ROAD, between Union Valley Road & Mt Tabor Road: Monroe County SW Crews will be ditching in this area on Monday, December 5, 2022 - Tuesday, December 6, 2022 from 7am - 3pm. There will be lane restrictions with traffic control.
    • JUDD AVENUE, between Jeffrey Road & Woodhaven Drive: Monroe County SW Crews will be ditching in this area on Thursday, December 8, 2022 from 7am - 3pm. There will be lane restrictions with traffic control.
    • LARRY WAYNE DRIVE, between Smith Road & ECM: Monroe County SW Crews will be ditching in this area on Friday, December 9, 2022 from 7am - 3pm. There will be lane restrictions with traffic control.
    • RHORER ROAD, between Walnut Street Pike & Gran Haven Drive: Monroe County SW Crews will be ditching in this area on Wednesday, December 7, 2022 from 7am - 3pm. There will be lane restrictions with traffic control.

    https://www.co.monroe.in.us/egov/apps/document/center.egov?view=item;id=198

    ---

    Monroe County Road Closings & Construction for the Week of November 28, 2022

    ROAD CLOSINGS

    • HEDRICK ROAD, at the Intersection of Stinesville Road, (between Stinesville Road & Foster Fiscus Road): Hedrick Road will be closed at the intersection of Stinesville Road on Monday, November 28, 2022 for Monroe County CB Crews to replace a culvert.
    • THE INTERSECTION OF SIMPSON CHAPEL ROAD & SAMPLE ROAD: This intersection will be closed Tuesday, September 6, 2022 – Friday, December 16, 2022 for road construction.
    • SAMPLE ROAD, from I-69 to Old SR 37 North: Sample Road remains closed in this area through December 16, 2022 for road construction. Detour uses Wayport Road, Ellis Road, Showers Road and Mel Currie Road, No through trucks. Trucks use I-69 to Walnut (Business 37 N) to Old SR 37 N.
    • SAMPLE ROAD, from I-69 to Simpson Chapel Road: Sample Road will be closed in this area August 22, 2022 – December 16, 2022 for road construction. Detour uses Simpson Chapel Road, Burma Road, Chambers Pike and Wayport Road. IN CASE OF FLOODING: If Bottom Road and/or Woodall Road floods, people north of Simpson Chapel will be able to use Dittemore Road. People south of Simpson Chapel will be able to use Lawson Road. Thru traffic will need to detour via I-69 to Sample Road or via Mt Tabor Road. The Sample Road north/south section (Lawson detour) will stay open until the intersection is complete at Bottom Road and Simpson Chapel Road.
    • SIMPSON CHAPEL ROAD, from Bottom Road to Sample Road: Simpson Chapel Road remains closed in this area through December 16, 2022 for road construction. Detour uses Bottom Road, Dittemore Road, Chambers Pike and Wayport Road.
    • STINESVILLE ROAD, between Hedrick Road & Mt Carmel Road, starting at the Intersection of Hedrick Road: Stinesville Road will be closed in this area Monday, November 28, 2022 – Friday, December 2, 2022 for Monroe County CB Crews to replace several culverts.
    • STINESVILLE ROAD, between Hedrick Road & Mt Carmel Road: Stinesville Road will be closed in this area on Thursday, December 1, 2022 & Friday, December 2, 2022. Monroe County SW Crews will be ditching in this area. Ditching work is being completed in conjunction with the Monroe County CB Crews culvert replacements closure listed above.

    ROAD CONSTRUCTION

    • DELAP ROAD, between Union Valley Road and N Mt Tabor Road: Monroe County SW Crews will be ditching in this area on Monday, November 28, 2022 – Wednesday, November 30, 2022 from 7am – 3pm. There will be lane restrictions with traffic control.

     

    https://www.co.monroe.in.us/egov/apps/document/center.egov?view=item;id=198

    ---

    Monroe County Road Closings & Construction for the Week of November 21, 2022

    ROAD CLOSINGS:

    • HEDRICK ROAD, at the Intersection of Stinesville Road: Hedrick Road will be closed at the intersection of Stinesville Road on Monday, November 28, 2022 for Monroe County CB Crews to replace a culvert.
    • LOESCH ROAD, between Woodyard Road & Old Vernal Pike: Loesch Road will be closed in the vicinity of 2888 N Loesch Road on Monday, November 21, 2022 for Monroe County CB Crews to install a new culvert.
    • THE INTERSECTION OF SIMPSON CHAPEL ROAD & SAMPLE ROAD: This intersection will be closed Tuesday, September 6, 2022 – Friday, December 2, 2022 for road construction.
    • SAMPLE ROAD, from I-69 to Old SR 37 North: Sample Road remains closed in this area through December 2, 2022 for road construction. Detour uses Wayport Road, Ellis Road, Showers Road and Mel Currie Road, no through trucks. Trucks use I-69 to Walnut (Business 37 N) to Old SR 37 N.
    • SAMPLE ROAD, from I-69 to Simpson Chapel Road: Sample Road will be closed in this area August 22, 2022 – December 2, 2022 for road construction. Detour uses Simpson Chapel Road, Burma Road, Chambers Pike and Wayport Road. IN CASE OF FLOODING: If Bottom Road and/or Woodall Road floods, people north of Simpson Chapel will be able to use Dittemore Road.  People south of Simpson Chapel will be able to use Lawson Road. Thru traffic will need to detour via I-69 to Sample Road or via Mt Tabor Road. The Sample Road north/south section (Lawson detour) will stay open until the intersection is complete at Bottom Road and Simpson Chapel Road.
    • SIMPSON CHAPEL ROAD, from Bottom Road to Sample Road: Simpson Chapel Road remains closed in this area through December 2, 2022 for road construction. Detour uses Bottom Road, Dittemore Road, Chambers Pike and Wayport Road.
    • STINESVILLE ROAD, between Hedrick Road & Mt Carmel Road: Stinesville Road will be closed in this area on Monday, November 28, 2022 - Friday, December 2, 2022 for Monroe County CB Crews to replace several culverts.

    ROAD CONSTRUCTION:

    • BREEDENS ROAD, between Carter Road & Rockeast Road: Monroe County SW Crews will be ditching in this area on Tuesday, November 22, 2022 from 7am - 3pm. There will be lane restrictions with traffic control.
    • HOWARD ROAD, between Vernal Pike & ECM: Monroe County MVH Crews will be ditching in this area on Monday, November 21, 2022 - Wednesday, November 23, 2022 from 7am - 3pm. There will be lane restrictions with traffic control.
    • STINESVILLE ROAD, between SR 46 & Hedrick Road: Monroe County SW Crews will be ditching in this area on Friday, November 18, 2022 & Monday, November 21, 2022 from 7am - 3pm. There will be lane restrictions with traffic control.
    • UNION VALLEY ROAD, between Maple Grove Road & Delap Road: Monroe County SW Crews will be ditching in this area on Wednesday, November 23, 2022 from 7am - 3pm. There will be lane restrictions with traffic control.

    https://www.co.monroe.in.us/egov/apps/document/center.egov?view=item;id=198

    ---

    Monroe County Road Closings & Construction for the Week of November 14, 2022

    ROAD CLOSINGS:

    • POPCORN ROAD, between Linthicum Road & Rockport Road: Popcorn Road will be closed in the vicinity of 5522 Popcorn Road on Tuesday, November 15, 2022 for Monroe County CB Crews to replace a culvert.
    • THE INTERSECTION OF SIMPSON CHAPEL ROAD & SAMPLE ROAD: This intersection will be closed Tuesday, September 6, 2022 – Friday, November 18, 2022 for road construction.
    • SAMPLE ROAD, from I-69 to Old SR 37 North: Sample Road remains closed in this area through November 23, 2022 for road construction. Detour uses Wayport Road, Ellis Road, Showers Road and Mel Currie Road, no through trucks. Trucks use I-69 to Walnut (Business 37 N) to Old SR 37 N.
    • SAMPLE ROAD, from I-69 to Simpson Chapel Road: Sample Road will be closed in this area August 22, 2022 – November 18, 2022 for road construction. Detour uses Simpson Chapel Road, Burma Road, Chambers Pike and Wayport Road. IN CASE OF FLOODING: If Bottom Road and/or Woodall Road floods, people north of Simpson Chapel will be able to use Dittemore Road. People south of Simpson Chapel will be able to use Lawson Road. Thru traffic will need to detour via I-69 to Sample Road or via Mt Tabor Road. The Sample Road north/south section (Lawson detour) will stay open until the intersection is complete at Bottom Road and Simpson Chapel Road.
    • SIMPSON CHAPEL ROAD, from Bottom Road to Sample Road: Simpson Chapel Road remains closed in this area through November 18, 2022 for road construction. Detour uses Bottom Road, Dittemore Road, Chambers Pike and Wayport Road.

    ROAD CONSTRUCTION:

    • HACKERS CREEK ROAD, between Hackers Creek Place & ECM: Monroe County CB Crews will be replacing a culvert in this area on Wednesday, November 16, 2022, from 7am - 3pm. There will be lane restrictions with traffic control. Expect delays.
    • HOWARD ROAD, between Vernal Pike & ECM: Monroe County MVH Crews will be ditching in this area on Monday, November 14, 2022 - Friday, November 18, 2022, from 7am - 3pm. There will be lane restrictions with traffic control.
    • LOESCH ROAD, between Woodyard Road & Old Vernal Pike: Monroe County SW Crews will be ditching in this area on Wednesday, November 16, 2022, from 7am - 3pm. There will be lane restrictions with traffic control.
    • LORI LANE, just South of Cedar Crest Drive: Monroe County CB Crews will be replacing a culvert in this area on Monday, November 14, 2022, from 7am - 3pm. There will be lane restrictions with traffic control. Expect delays.
    • LOST MANS LANE, between White River Drive & Truesdel Drive: Monroe County SW Crews will be ditching in this area on Thursday, November 17, 2022, from 7am - 3pm. There will be lane restrictions with traffic control.
    • ROGERS ROAD, between Old SR 37 South & ECM: Monroe County CB Crews will be replacing a culvert in this area on Thursday, November 17, 2022, from 7am - 3pm. There will be lane restrictions with traffic control. Expect delays.
    • STINESVILLE ROAD, between SR 46 & Hedrick Road: Monroe County SW Crews will be ditching in this area on Friday, November 18, 2022, from 7am - 3pm. There will be lane restrictions with traffic control.
    • TOWER ROAD, between Ison Road & ECM: Monroe County SW Crews will be ditching in this area on Monday, November 14, 2022 - Tuesday, November 15, 2022 from 7am - 3pm. There will be lane restrictions with traffic control.

    https://www.co.monroe.in.us/egov/apps/document/center.egov?view=item;id=198

    ---

    Monroe County Road Closings & Construction for the Week of November 7, 2022

    ROAD CLOSINGS:

    • THE INTERSECTION OF SIMPSON CHAPEL ROAD & SAMPLE ROAD: This intersection will be closed Tuesday, September 6, 2022 – Tuesday, November 15, 2022 for road construction.
    • SAMPLE ROAD, from I-69 to Old SR 37 North: Sample Road remains closed in this area through November 23, 2022 for road construction. Detour uses Wayport Road, Ellis Road, Showers Road and Mel Currie Road, no through trucks. Trucks use I-69 to Walnut (Business 37 N) to Old SR 37 N.
    • SAMPLE ROAD, from I-69 to Simpson Chapel Road: Sample Road will be closed in this area August 22, 2022 – November 15, 2022 for road construction. Detour uses Simpson Chapel Road, Burma Road, Chambers Pike and Wayport Road. Note: If Bottom Road and/or Woodall Road flood, people north of Simpson Chapel will be able to use Dittemore Road. People south of Simpson Chapel will be able to use Lawson Road. Thru traffic will need to detour via I-69 to Sample Road or via Mt Tabor Road. The Sample Road north/south section (Lawson detour) will stay open until the intersection is complete at Bottom Road and Simpson Chapel Road.
    • SIMPSON CHAPEL ROAD, from Bottom Road to Sample Road: Simpson Chapel Road remains closed in this area through November 18, 2022 for road construction.Detour uses Bottom Road, Dittemore Road, Chambers Pike and Wayport Road.

    ROAD CONSTRUCTION:

    • BUSINESS 37 NORTH, just east of the I-69 Interchange, Bridge# 913: This area will be reduced to one lane on Monday, November 7, 2022 - Friday, November 18, 2022 for bridge joint replacement by Ragle Construction. A temporary traffic signal will be used to maintain one lane of traffic. Expect delays. To avoid delays, use the I-69/SR 46 interchange located south of the Walnut Street/College Street exit.
    • COMMODORE TRAIL, between Russell Road & Cul-de-sac: Monroe County MVH Crews will be full depth patching in this area on Monday, November 7, 2022 - Thursday, November 10, 2022, from 7am - 3pm. There will be lane restrictions with traffic control.
    • CRIDER DRIVE, between Ridgewood Drive & Killion Court: Monroe County SW Crews will be cleaning a culvert in this area on Monday, November 7, 2022, from 7am - 3pm. There will be lane restrictions with traffic control.
    • TOWER ROAD, between Ison Road & ECM: Monroe County SW Crews will be ditching in this area on Wednesday, November 9, 2022 - Thursday, November 10, 2022, from 7am - 3pm. There will be lane restrictions with traffic control.

    https://www.co.monroe.in.us/egov/apps/document/center.egov?view=item;id=198